Ranger Pro using System 1™
Basic Ranger Pro configuration and operation using the Ranger Pro Configuration software, the Gateway application, and communicating with System 1™ for analysis, display and reports.
- Reliability, Condition monitoring engineers
- Users of System 1™ who have purchased Ranger Pro wireless
- Engineers involved in preventive maintenance and Operations
Deploy, operate, and manage Ranger Pro wireless condition monitoring system in industrial plants.
Use gateways and Ranger Pro software with System 1™, learners will successfully install, operate, and maintain Ranger Pro sensors.
The participants will have hands-on knowledge to properly install and configure the Ranger Pro devices with one of the following gateways: the duration is designed for one gateway. Add 4 hours for each additional gateway.
Bently Nevada™ Ranger Pro Gateway
One gateway of your choosing; Add 4 hours for each additional gateway.
- Emerson Gateway
- Honeywell Gateway
- Yokogawa Gateway
Students are expected to have a basic knowledge of one or more of the followings:
- Networking
- System and Instrumentation
- Machinery vibration
- Plant operation and maintenance
Fundamentals of vibration measurements / ISO18436 Cat. I